Tel: 021-61392716 / 021-61392717
Fax: 021-61392313
Email: sales@taiyangkj.com
Add: 888 Fulian Road, Baoshan District, Shanghai
Nantong Taiyang High-tech Materials Technology Co., Ltd.
The first public announcement of the environmental impact assessment of the annual 812 tons fluoride expansion and safety and environmental improvement project
(1) Project Overview
Project name: Annual output of 812 tons of fluoride expansion and safety and environmental protection improvement project
Construction unit: Nantong Taiyang High-tech Materials Technology Co., Ltd.
Construction location: On the east side of Tongshun Road, Nantong Economic and Technological Development Zone, on the south side of Jiangshan Road, within the existing factory area of Nantong Taiyang High-tech Materials Technology Co., Ltd.
Project nature: Renovation and expansion
Construction scale and content: Add reactors, centrifuges, microwave drying tunnel furnaces and other equipment, and use the existing main engineering, production equipment, public auxiliary facilities, etc. to add fluoride production capacity of 812t/a; and upgrade existing environmental protection facilities Improvement and transformation. After the completion of this project, the total fluoride production capacity of the entire plant can be achieved at 847.8t/a.
(2) Name and contact information of the construction unit
Name of construction unit: Nantong Taiyang High-tech Materials Technology Co., Ltd.
Unit address: Nantong Economic and Technological Development Zone, east of Tongshun Road, south of Jiangshan Road, Nantong
Contact person: Manager Zhou
Contact number: 0513-89197920
(3) Name and contact information of the unit that prepared the environmental impact report
Name of the unit that prepared the environmental impact report: Jiangsu Runhuan Environmental Technology Co., Ltd.
Unit address: 14th Floor, Jinjian Building, No. 64 Shuizogang, Gulou District, Nanjing
Contact person: Chen Gong
Contact number: 025-85303391
Email: purple0525@foxmail.com
(4) Online link to the public comment form
If you have any comments and views on the project, you can fill in the public participation opinion form for environmental impact assessment of construction projects according to the format of the URL link below.
Public Comment Form: Please see the attachment below the announcement for details.
(5) Methods and channels for submitting public opinion forms.
During the preparation process of the environmental impact report solicitation draft, the public can provide opinions related to environmental impact assessment to the construction unit. The public can submit opinions to the construction unit and environmental impact assessment unit directly by telephone, fax, email, regular mail, or directly.
(6) Starting and ending time for public comments
From the date of public announcement to the date of public announcement of the draft environmental impact report.
Nantong Taiyang High-tech Materials Technology Co., Ltd.
Attachment: Public Comment Form on Environmental Impact Assessment of Construction Projects.docx